So I’ve shown you the before and the midway point in our main bathroom makeover by Miracle Method. Today we see the finished product.
It’s exactly as we ordered it.
We’re very happy with it! It had to “rest” for 24 hours, so the 2-day process is really 3 days but at least I can go in and out and get things and even tinkle if necessary.
The counter has a bit of a rough feel to it which we also like. They did the sink white to make it appear like a separate piece, which we asked for and we’re happy with. The tub and surround are perfect and smooth. Now we have to see how it endures.
Downsides? The smell is unpleasant but it doesn’t last very long. They told us some paint might come off with the protective tape and it did. I painted a couple of areas top to bottom before I moved everything back in. As long as we were told it could happen, I lay no blame that it did.
As an experience, it was a good one. The technician was a great guy. He even brought our garbage can and blue box up to the house when we were away on Friday. There wasn’t a thing out of place in the house and no mess left behind whatsoever. As long as the product holds up we are happy customers. And that’s something that only time will tell.